Rooftop solar calculator
Rising electricity bills? A rooftop solar system can cut them sharply — and the government pays part of the cost. Thissolar panel calculator takes your monthly units and estimates the system size in kW, the number of panels, the roof space you'll need, the cost, the PM Surya Ghar subsidy, yourmonthly savings and how many years it takes to pay for itself. Adjust the generation figure for your region and the cost per kW from vendor quotes.
How to use it
- Enter your average monthly units (from your electricity bill) and cost per unit.
- Adjust units per kW per day for your region, panel size and cost.
- See system size, subsidy, savings and payback.
Example
A home using 300 units a month at ₹7 per unit needs about 2.5 kW (five 540 W panels, ~250 sq ft of roof). At ₹60,000 per kW it costs ₹1,50,000; the central subsidy of ₹69,000 brings it to ₹81,000. Saving about ₹2,100 a month, it pays back in roughly 3.2 years — and panels last 25 years. Check your bill with the electricity bill calculator.
Frequently asked questions
How many kW of solar do I need?
Divide your monthly electricity units by 30 to get daily use, then by how many units 1 kW of panels makes per day — about 4 in most of India (3.5 in cloudy, hilly or northern regions in winter; up to 5 in Rajasthan and Gujarat). A home using 300 units a month needs about a 2.5 kW system.
How much subsidy can I get?
Under the PM Surya Ghar Muft Bijli Yojana (launched 2024), homes get a central subsidy of ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW — a maximum of ₹78,000 for 3 kW or more. Some states add their own subsidy. Apply on the national portal (pmsuryaghar.gov.in) through a registered vendor; check the current rules before you buy.
How much roof space is needed?
About 100 sq ft of shadow-free roof per kW. A 3 kW system needs roughly 300 sq ft.
What does a rooftop system cost?
Grid-connected rooftop systems commonly cost around ₹50,000–₹70,000 per kW before subsidy, depending on panel type, structure and brand. Get quotes from at least two registered vendors.